Alterations 2023

SECTION C

Signalling alterations: 2023

2023

Perth-Ptilochry

Mechanical boxes at Stanley Junction and Dunkeld, to be abolished, area to be controlled from East Scotland Regional Operations Centre at Edinburgh.

2023

Blair Atholl

Blair Atholl box to close, area to be controlled from East Scotland Regional Operations Centre at Edinburgh.

2023

Gretna Junction-Kilmarnock

Annan, Dumfries Station, Thornhill, Kirkconnel, New Cumnock, Mauchline, Hurlford and Kilmarnock to be abolished. Almost all of these boxes are manual cabins and if it survived until then, this will see the end of the Glasgow & South Western blocks currently in use.

2023

Lincoln-Barnetby

Langworth, Wickenby and Holton-le-Moor to be abolished, area to be controlled by LNE Regional Operations Centre at York.

2017
to
2023

Three Bridges

Three Bridges power box to close.

2023

Brockenhurst

Brockenhurst box to close, area to be controlled from Wessex Regional Operations Centre at Basingstoke.

2023

Marchwood

Marchwood box to be abolished, area to be controlled from Wessex Regional Operations Centre at Basingstoke.

2023

Immingham-Grimsby

Great Coates Sidings No1 (not in regular use) and Pywipe Road boxes to close, area to be controlled by LNE Regional Operations Centre at York.

2023

Dumfries

Dumfries Station panel box to close, area to be controlled from West Scotland Regional Operations Centre at Glasgow Springburn.

2023

Kilmarnock-Barrhead

Kilmarnock, Lugton and Barrhead boxes to close, area to be controlled from West Scotland Regional Operations Centre at Glasgow Springburn.

View other dates

1998   1999   2000   2001   2002   2003   2004   2005   2006   2007   2008   2009   2011   2012   2013   2014   2015   2016   2017   2018   2019   2020   2021   2022   2023   2024   2025   2026   2027   2029   2030   2033   2035   2036   2037   2038   2040   2047   2048   2051   2055   2056   2058  

Black and White Premium WordPress Theme